Loaded: The Hahn Ready Mix Podcast
A podcast for the employees of Hahn Ready Mix
Loaded: The Hahn Ready Mix Podcast
86. Decoding a Concrete Ticket
Use Left/Right to seek, Home/End to jump to start or end. Hold shift to jump forward or backward.
Andrea, Griff and Lex walk through a concrete batch ticket and decode what everything means.
Also: It's starting to get cold.
AND: Communication is Important!
Welcome to Loaded the Han Ready Mix podcast with Andrea Meyer, Griffin Hahn, and Birthday Boy, producer Lex.
SPEAKER_01Hey oh. Yesterday.
SPEAKER_00Sometimes we sing happy birthday on this podcast. Let's hear it.
SPEAKER_01We missed it. It was yesterday.
SPEAKER_02What do you mean?
SPEAKER_00If we recorded yesterday, we would have Okay.
SPEAKER_02Whatever. Whatever. My kids called you and sang happy birthday, and I'm pretty sure uh Lucas included the lyrics I'm gonna fart on your head or something like that.
SPEAKER_01Yeah, he said he was gonna toot on me.
SPEAKER_02Yeah.
SPEAKER_01And I told him he's got to save up. He needs 27 toots. So that's that's on brand for him.
SPEAKER_00Uh that's awesome. Well, it's chilly today.
SPEAKER_02It's very chilly. It's no fun. It's gonna be worse tomorrow morning.
SPEAKER_00Yeah. Potentially freezing.
SPEAKER_02Potentially freezing. Yeah, that's not good. I don't like it at all.
SPEAKER_00Right on time, though. Sometime in the history of my time at Honready Mix, I decided to put a note on my calendar on October 15th to start thinking about winter. Well, you know all the things that come with that.
SPEAKER_02There's some Iowa DOT specs and and City of Bettendorf specs back in the day that required mixed design changes uh on October 15th, pulling the fly ash out of the mix. So it's it's it's a date that instigates some of those changes, or at least used to.
SPEAKER_00So it is time for us to start, even though probably when this podcast comes out, it's gonna be back to 70s.
SPEAKER_02Yeah. So this week it looks like it's gonna be all 70s, so great. But um we do have to start orientating our mind around its cold weather conditions again and and what that means for you know, clearing out airlines and water lines and making sure, you know, probably not to trucks being plugged in and everything yet, but that all that's coming.
SPEAKER_00Yeah. And we do I did just talk to Sheldon about getting uh getting all the new guys back in to the shop to really learn the in-depth process of draining our lines and knowing what to expect. But yeah it's a good reminder for everyone that it's that time.
SPEAKER_02Absolutely.
SPEAKER_00I also wanted to remind everyone or just always always talking about some form of housekeeping around here, but we did install some new hoses in the wash bay, like outside the wash bay, and it's really easy for us to run them over if they're strung out on the ground instead of wrapped up and put back where they go. So just even if you didn't leave it laying out, if you see it laying out and you can wrap it up, that just makes it work better for everyone long term. And same thing with making sure I guess you turn off the air over there to not waste material washing. So just keep that in mind. The more we take care of that, the better it is for everybody.
SPEAKER_02Yeah.
SPEAKER_00And then my last announcement, which I realize is like it's sort of rich coming from me as a under-communicator in general. But we had a couple incidents this week where communication was the number one thing that we could have done better.
SPEAKER_02Yeah.
SPEAKER_00Um, so whether you are a driver or you're quality control or you're a plant manager or you're in dispatch or you're on the job, like you have an obligation to communicate with everyone else in that loop every time something happens, especially if it's gonna delay.
SPEAKER_02Yeah. So specifically on this, we had an instant where we had a problem with the load at a plant and it was not communicated to dispatch, so they couldn't communicate to the customer. So the customer was left w without uh the the knowledge of what was going on that we were gonna be running late and we're we're upset. And so that's a situation where people that weren't customer facing weren't thinking about the you know, that portion of um they were focused on fixing the issue.
SPEAKER_00Yeah, they were that's the prediction. Yeah.
SPEAKER_02But is you know, it's dispatch job in this situation to make sure the customer is informed, and that is a huge aspect of the customer service culture that we want is that um we're transparent when things aren't going great. But if they don't know or or can't provide some kind of uh reasonable expectation of a guest to the the contractor when we might show up, then uh that whole process breaks down. So it's just important to realize that there's a a chain of events that uh happens when everything is going well. And and um yeah, there are a couple instances that didn't happen the way we wanted to this week.
SPEAKER_00If you think about making the call, make the call.
SPEAKER_02Yeah.
SPEAKER_00If you're not thinking about making the call, you should be.
SPEAKER_02Yep.
SPEAKER_00Even me. I'm saying this to myself, everyone.
SPEAKER_02Or or just a team's message, right? Or or you know, to whatever's fastest, you know, that we just need to get the communication out.
SPEAKER_00Um very good. What are we gonna talk about today?
SPEAKER_02Um so the our idea today is to kind of decode one of our concrete tickets. There's a lot of stuff on the tickets. And I would assume most of our drivers know what some, or maybe some of them know what everything is on there, but it'd be good to go through it, particularly anyone listening that has a ticket in front of them can follow along and look at the different um information that's shared on the ticket and what why it might be important to uh the different people that would be looking at the ticket. Does that make sense?
SPEAKER_00I love this. You know, I love a tactical podcast. So anything where we have something in front of us and can get everybody on the same page is my favorite. Let's let's do it.
SPEAKER_02All right. Where should we start?
SPEAKER_00What do you what do you look at first if you're the driver? What's the the first thing you check when you pick up this ticket?
SPEAKER_02I think there's a lot of things at once. The delivery address and the delivery instructions are at the very top, right? So let's just start with that. Um, the address is there. It should be if you're a driver, it should be paired with the directions that you get in on the tablet in your truck. However, those directions we cannot like adjust the way we're coming, right? So it's going to say this is the most efficient way to get from where you are to the job site. If there are delivery instructions on the right side of the top of the ticket, that supersedes the instructions that you might get on your tablet because the contractor may have said, you got to come in from the north, you got to come in from the south, or stay off third street or whatever. And so we have to follow those directions. So that is most important if there are delivery instructions up at the front.
SPEAKER_00Yeah. So you are validating the information against the tablet. Also, if there's ever a discrepancy, that would be check with the play manager or check with dispatch if it says something different.
SPEAKER_02Yep. Uh, after that, the next most important is you see your load size, which tells you, you know, do I need to drop my bridgemaster and push pusher axles? Just being aware of how many yards you have on is very important. And the slump that the company is.
SPEAKER_00Ooh, I see the slump boxes like highlighted.
SPEAKER_02The slump box is extra highlighted. So this is in the second row, right? So the things that are in this row are the time, that is the batch time. Uh, the mixed formula number is the mixed design code. Then you have load size, the yards ordered in the whole order, right? So if it says your load size is six and yard ordered is 12, um, you're either the first or second six-yard load. And that will tell you uh in the second row just below yards orders that yards delivered. If that were to say 12, uh, you would be the second load out of uh two. If that says six, you know, you're the first load. You have the slump, the load number, the order number, which is, you know, not super relevant for a driver. Um, and then it's important to check your truck number is correct, right? That you got the correct ticket, because that has certainly happened before where somebody's grabbed the wrong ticket and gone to the wrong job site. But before you leave, you should know where you're going, how you're gonna get there, how many yards do you have on, and what your slump is. That's the critical information. And compare what slump you have to what slump you need to have on site. So that's kind of the information at the top of the ticket. And then you have uh a quantity and codes and descriptions of items kind of in the middle. And these are primarily kind of the financial part of the ticket. So it's telling the customer you have, you know, let's use that example, six yards uh of a certain mix. And then these are the add-ons that you might see. So you might see you almost certainly will see a delivery charge, fuel surcharge, and then you know, any extra products if they have some different ad mixtures or fibers. Um, those are in that middle part. And that's just giving the customer some information on you know what are they being charged for.
SPEAKER_01I think it's also very important for drivers because you're gonna see your mix design. Like in we have a ticket up right now, and it shows your mix design, and after that, it shows a no-ash mix, which is really important. More experienced drivers will understand this, but no ash means it's gonna set up faster, you're gonna lose slump faster. So you got to keep that in mind. And then you have other products like recover, which is slowing down that set time. And if there's fiber in there too, that's a double check for oh, maybe they didn't say fiber when they sent you the ticket over and it didn't come over on the tablet. Well, that's your chance. It's second check is on that ticket and you can see how much fiber you need and always ask anyone if you're unsure.
SPEAKER_02It will be there. Absolutely. So we should have a stamp on there, but it, you know, it's a human process, could break down. So double check if there are fibers on there, they need to be added to the load. So that's a good point, Lex. That's a critical thing to be aware of before you leave as well. As you get to the bottom third of the ticket, that is where the batch weights are. So this is information that um an engineer will want to know, or if there's ever kind of an issue with uh the concrete, then we can go back and look. Inspectors uh on job sites uh doing quality control or quality insurance will be looking at this. So this is the the actual contents of the mix that have been put in your truck. So you have your different materials. And if you see, like if you see SEM, that's cement. If you see like it starts with FA, um, that's a lot of times that's sand, and that's it's it's F ash is fly ash, slag is slag. If you see a code starting with CA, that's uh your course aggregate, your rock, water is of course water, and then a lot of times you'll get admixtures and they'll be just spelled out what they are. Um it'll have a design quantity, which is what like uh uh the mixed design is on a single yard, and then it'll have the required. So basically it takes the design quantity multiplied by how many yards you have, and then batched is how many pounds were actually weighed up. So you can, and then there's a percent variance, the the difference between the batched and the required. Again, as a driver, um, that's not something you need to be totally looking at. I mean, if you see something where it was 50% off or something, it may be worth a question to uh the batch person, but that is um that that should be all be caught ahead of time by the batch person if there's any large variance. Um, it'll tell you or tell an inspector how much water is in each of the aggregates and total water in the mix. Um, and that's important because uh a lot of mixed designs have water cement ratio limits. And so calculating the water and the total cementitious, you can back into how much water can be added on site. And so that'll show up on the ticket. The one I'm looking right now says in the bottom right corner says to add 35.7. So that means you can add 35 gallons of water, and this load is still in the water cement ratio spec. Um, there could be a lot of reasons why you don't want to add that water. The slump could already be high enough, or um, you know, there could be other concerns, but just on the ticket, that's how much water you can add and still be in spec. There are certainly jobs that don't have specifications. We just have kind of a standard number put in where you could add more water than what they're saying. But that's, you know, the call for the folks on the site to make.
SPEAKER_01Uh there is one field that I think that we should talk about a little bit more. And I just want you to think about the ticket as being a top-down process, basically. Before you get to the batch weight summary, there's an improved and received by signature box. This can be very important when we're having a customer that wants us to drive on their lawn or on their concrete or somewhere that we technically shouldn't be unless we have proper authority from someone else to do so. So let's make sure that you when you get to that job, if someone's asking you to do something, you write it on the ticket and you get their signature so that we have our basis covered when it comes to something like that.
SPEAKER_02Yep. Pretty much any residential job where we're crossing the curb line, or, you know, if it's a not a new construction job and we're going in someone's yard or something like that, that is uh, or a driveway. We we definitely need to get signed because that's a waiver of liability for us. So that if a homeowner backs uh a fully loaded ReadyMix truck onto their driveway and it buckles their driveway, they're not coming back to us and saying, you know, it's your fault, you got to replace this driveway. So that is very important. There's also an area to add just above the batch weights if there's any additional water. Now we do collect this from Digital Fleet and the end of your load. Um, but it is also helpful to have a second place to verify that water if you want to, you know, if you added 10 gallons on site, put 10 gallons there. Sometimes as we're investigating issues, it's it's easier to see it if it's right on the ticket, and the customers could believe it more readily. It seems like if you somebody added 80 gallons of water, you can write it right on the ticket and we scan it in and we have that to show them, you know, a year later. That that's pretty powerful rather than pulling it from a report. So yeah, in an ideal world, you'd re report it on Digital Fleet and write it on the ticket. Just looking at this, I realized we skipped another important part of the ticket. So we better talk about that. On the middle right-hand side, uh, there'll be a grand total on a COD order. So if we need to collect money from a COD, um, it'll give the total there and it should have a stamp on the tickets that says please collect if you need to collect from the a COD customer, a check or a cash. I mean, most of the time they're paying with credit card CODs are now, but we still have some holdouts that do it differently. So if you need the total, it's it's right. It's also important in case anybody asks that our printed tickets have an SDS warning on the back of the tickets with information on cement burns and things like that. So um that's some kind of legal and required um environmental disclosures that that go with delivering concrete. So that's on the back of the ticket.
SPEAKER_00There's also the barcode on the ticket that might not make sense to anyone, but we scan these in, and that barcode helps us um index them in the system so that they can be retrieved when we need them. Um so every single thing on it has a purpose. Even if you don't, even if it doesn't matter to you, it matters somewhere.
SPEAKER_02Yep. And we do have uh there's a section for times and that that is a little archaic because we have everything GPS mapped so that it is not not super important. I guess you can use that field if something really weird happens, right? If there is a delay for something um really uh unusual that you think it'd be important for the office to know at some point, um, that would be a good place to write down some of those times or a reason for delay. But um, most of the time you don't definitely don't need to worry about filling that out every load.
SPEAKER_00There's so much on here. It's crazy. That there's something we take for granted a hundred times a day. Yeah and you know, hardly give it a second look, but there really is so much to it. So I'd actually be curious if people, you know, as you're listening to this podcast, if you have any questions or something that we didn't talk about, I would love to follow up on that. Yeah. Um, or if you have any stories or experiences of issues or mistakes with tickets or something that you learned. I mean, I know back from back from when I started, I know there was uh, you know, a lot of times it's easy to just see like John Deere at the top of a ticket and you think that you know where you're going because you went there five times yesterday. Right. And if you don't really look close, it's easy to to overlook that you're going somewhere else. So yeah, uh so many details to pay attention to so many times a day.
SPEAKER_02But have we covered the ticket? Yeah, decoded, bit messy, bit messy. But maybe the producer can put this back in order. Godspeed. Okay.
SPEAKER_00Do we have a word, word of the week?
SPEAKER_02Um, yeah. So I will I had had a few different ideas. I'll just pick one kind of at random. Let's do uh reinforcement. So concrete uses well, let's start it a different way. Concrete is really strong in compressive strength. So when you push concrete from either end, um, or you put weight on a concrete slab, um, have a concrete pillar that's holding up a house or a building, whatever, it's really good at it. Like it's really resistant to compressive loads. So that is the key reason that concrete is used in so much uh different construction activity. The problem with concrete is it's not very good at tensile strength, which basically pulling loads or you know, sometimes shearing side to side loads, those types of things. So um we use reinforcement, um, traditionally steel. So that could be rebar, wire mesh, things like that, that help the concrete resist pulling actions or you know, side to side movement, things like that. Like I said, most of the time it's steel, but uh more recently, you know, they have a lot of kind of macro fibers um that are made out of polypropylene that give reinforcement, but they they serve the same purpose basically to give concrete uh more tensile strength. And I think a good way to think about this, whenever I do the concrete 101 class, uh I take a piece of paper and I say, you know, paper has really good compressive strength. You can put a piece of paper down on the floor and you can drive a car over that paper. And as long as whatever is underneath the paper is strong enough, the paper is going to be fine when you drive a car over it because it's you know, it has decent compressive strength. But if you take paper and pull it from both ends, it's really easy to rip it in half. It's very simple, has very very low uh tensile strength, right? So uh Lux is dubious that I can rip a paper in half. You just, you know, you just but sometimes it's easiest to make a little bit rippy. Yeah, yeah, yeah. We are pulling it apart. It's low tensile strength. So anyway, I was hoping you were gonna karate. He does jujitsu, not uh karate. So paper is similar in that it it it is not good at resisting the pulling action, but it has decent compressive strength. So um that's a good way to think of concrete, and that's why we put reinforcement down. And a lot of times we have mixes that are designed to work with specific types of reinforcement. So, like, for example, on the I-74 bridge, there are so much steel reinforcement in the columns that we had to use a self-consolidating mix that could flow through all that tight rebar congestion. So, you know, the the reinforcement sometimes dictates the type and of concrete we can use.
SPEAKER_00Good.
SPEAKER_02Fiber.
SPEAKER_00I was nervous. You started about fiber. You started with a lot of big words, but then you brought it around at the end.
SPEAKER_02Lex wasn't listening, clearly.
SPEAKER_00The paper, the paper example helped.
SPEAKER_02Yeah. I guess the only thing I'd add with fiber is that um steel reinforcement gives tensile reinforcement along a specific axis that the steel runs. And the benefit of fibrous reinforcement, like macrofibers, is that gives it reinforcement in all directions, which is good. But if you have specific tensile forces pulling in one direction, then the fibers are giving kind of low level reinforcement in all directions. So sometimes you need fibers and steel in that situation. Uh, but fibers can be uh a really economical uh alternative to low levels of steel or wire mesh.
SPEAKER_00Nothing to add, Lex? You're all set.
SPEAKER_02Okay. Yeah.
SPEAKER_00All right. Thanks for listening, everyone. We'll talk to you again next week.
SPEAKER_02Thank you.
People on this episode
Podcasts we love
Check out these other fine podcasts recommended by us, not an algorithm.